Stairways in Hollybank Road

Client: Birmingham City Council
Project: Stairways in Hollybank Road
Product: Quartzdek

The safety and protection of Birmingham City Council's residentsfrom slip accidents in public areas is critical, so when the stairways at a development in Hollybank Road posed a potential problem, specialist solutions company, Acrypol Products, was asked to rectify the situation by installing Quartzdek.

Birmingham Accord, Birmingham City Council’s repair and maintenance division responsible for homes in the south of the city, was responsible for specifying a product that could combine outstanding anti-slip properties with proven waterproofing integrity while dramatically improving the look of the building’s walkways and stairways. Quartzdek provided the answer.

Quartzdek is available in a range of variegated colour mixes made from real quartz granules incorporated into a highly durable transparent resin base and offers waterproofing and slip resistant properties in one product. Fast and cost effective to install, Quartzdek will improve the safety and looks of heavily foot trafficked areas.

Back to Top | Back to Projects

Call Back Request

Related Downloads

downloadQuartzdek